NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability. The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power Project located on Satluj river in Bilaspur district of Himachal Pradesh. Other hydro project under construction are Tapovan Vishnugad, Lata Tapovan, Rammam III, THDC-Vishnugad Pipalkoti, THDC-Tehri PSP and NEEPCO-Kameng.

NTPC Owned 

Sr. No. STATION STATE CAPACITY (MW)
1. Koldam (HEPP) Himachal Pradesh 800
Total 800

Joint Ventures/ Subsidiaries

Sr. No. STATION STATE CAPACITY (MW)
1. Doyang HEP(3 X 25) (NEEPCO) Nagaland 75
2. Kameng HEP(4 X 150)  (NEEPCO) Arunachal 600
3. Kopili HEP(200+50+25) (NEEPCO) Assam 275
4. Koteshwar HPP (THDC) Uttarakhand 400
5. Pare HEP(2 X 55) (NEEPCO) Arunachal 110
6. Ranganadi HEP (3X135) (NEEPCO) Arunachal 405
7. Tehri HPP (THDC) Uttarakhand 1000
8. Tuirial HEP(2 X 30) (NEEPCO) Mizoram 60
Total 2,925